Paul Kerr, Disrepair (LANDSCAPE 2023)

Cunningar Road and the old railway bridge on the Galong, Boorowa line. The last train to cross this bridge was on 23 October 1987 and the bridge has fallen into disrepair. The bridge itself has plenty of character. A nine shot handheld panorama of the bridge in the fading light.

Images have been resized for web display, which may cause some loss of image quality. Note: Original high-resolution images are used for judging.